Search
-
Tension over financial checks on Tempe families indicative of new faultline in Greek politics
PoliticsGreek Politicsthat the raid exemplifies institutional abuse, turning the state into an adversary of citizens... growing prominence: admired by the public, but increasingly treated as a political adversary by those
30% -
Greece's key pledges and requests at the Eurogroup meetings
PoliticsGreek Politicsagreement that during this period the Greek state will be funded under a minimalist menu that solves
28% -
If you think it's bleak for Greece now, wait until tomorrow
Agoraproductivity growth since 1970 has been averaging 0.7 percent, by far the lowest in the euro area, which
25% -
Greek train firm TRAINOSE attracts just one bid, no interest in rolling stock
Economyin 2005 as a subsidiary of the Greek railway company (OSE), which was founded in 1970 and is wholly owned
23% -
Eurobank posts loss of 523.7 mln in Q4 2014
EconomyBanking. However, due to the drop in deposits by 4.3 percent QoQ, the loan to deposit (L/D) ration deteriorated... in the first two months of 2015 at an accelerating pace have led the current L/D ratio close to 120
21% -
Election Watch: 24 parties and coalitions apply to contest election
AgoraLeninist Communist Party of Greece [KKE (m-l)/M-L KKE] * Democratic Party (DIKO) (Christos Anagnostou
20% -
Election Watch: Greek voters to choose from 19 parties and coalitions
Agora) * Communist Party of Greece (Marxist-Leninist)/Marxist Leninist Communist Party of Greece [KKE (m-l)/M-L KKE] * Democrats/Koinonia Axion/Pirate Party of Greece * Golden Dawn (Nikos Michaloliakos
20% -
Does the EU Commission suffer from optimism bias? (Part 1)
Agora. Real GDP is the product of labor input and average labor productivity (Q = L *(Q/L)). Figure 2 shows
20% -
NPLs: The Achilles heel of the Greek banking system
Agorato banks’ solo accounts (parent level) which also include government loans as well as loans
20% -
Inauguration of TAP pipeline project offers investment, diplomatic boost
PoliticsForeign Policynear San Foca. The total length of the pipeline will be 867 kilometres of which 547 kilometres
20%